Our Markets - Civil Engineering

Strong capability in civil engineering

Carillion’s award-winning expertise in civil engineering transforms today’s society and makes tomorrow a better place.

A249 bridge in Kent

SHARE  Print Friendly and PDF

Civil Engineering

Carillion’s expertise in civil engineering has gained professional recognition and awards for numerous projects.

In recent years Carillion have worked on the M6 extension Carlisle to Guards Mill (for the Highways Agency), Rutland Water habitat (for Anglian Water PLC), Leeds inner ring road stage 7 (for Leeds City Council), M4 widening (for Welsh Assembly Government), East London Line (for Transport for London) and our works for Scottish Water via Scottish Water Solutions.

This award-winning capability in civil engineering supports Carillion's infrastructure services and construction services. It's all part of our fully integrated solutions to make tomorrow a better place.

Our civil engineering experience covers everything from flood defences to nuclear decommissioning, and from transport improvements to water and effluent treatment upgrades.

We have demonstrated the value of involving Carillion's civil engineering team at early stages of projects in order to optimise costs and minimise risks. We are proud and passionate about delivering a sustainable solution and work with all stakeholders and the local community.

Related Case Studies

Rail - Chiltern Railways Case Study Chiltern Railways

Chiltern Railway upgrade programme over 11 years including the first ‘Design, Build, Finance Transfer’ railway project.

> Read full case study

Rail - NR9 (ICE based) Design and Construct Case Study. Network Rail

Demolition and reconstruction of Coventry Road Bridge in central Birmingham to facilitate the movement of taller freight wagons between Southampton and the West Midlands/North West.

> Read full case study

Rail - Great Eastern Overhead Line Equipment renewals Case Study Network Rail

Installation of Overhead Line Equipment (OLE) between London Liverpool Street station and Chelmsford.

> Read full case study

Rail - Southampton Tunnel Case Study Network Rail

Installation of concrete track slab in Southampton Tunnel as part of the W10 Gauge Clearance Project.

> Read full case study

Rail - Reading Station Area Redevelopment Case Study Network Rail

Modular track installation project around Reading Station area.

> Read full case study

Rail - East London Line maintenance Case Study Transport for London

East London Line maintenance with multi-discipline skilled fault and maintenance teams.

> Read full case study

Civil Engineering - A1 Dishforth to Barton Case Study The Highways Agency

Upgrading a section of the A1 from a dual two-lane trunk road to a dual three-lane motorway between Dishforth and Barton.

> Read full case study

Civil Engineering - M6 Guardsmill Case Study The Highways Agency

Extending the M6 by upgrading 9km of the A74 between Carlisle and Guardsmill to a dual three lane motorway.

> Read full case study

Avaition - Gatwick Airport Case Study Gatwick Airport Limited

North West Zone - Taxiways and Runways Project including 6 new remote fully serviced stands and refuelling facilities.

> Read full case study